The minimum allowable ground bearing pressure will be dependent on the self-weight of the culvert, the traffic load applied, any construction loads, e.g. plant equipment trafficking over the culvert, the depth and density of the fill material placed on top of the culvert.
MPA Precast Drainage members can provide data for the predicted bearing pressure due to the culvert self-weight and fill material information supplied by the customer and the traffic load when disbursed through the fill material. However, the decision regarding suitability of the ground conditions is the responsibility of the main contractor and their geotechnical engineer.